SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Demand Management in SAP S/4HANA | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Production Orders in SAP S/4HANA | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Capacity Planning in SAP S/4HANA | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Process Orders in SAP S/4HANA | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). TS421, TS422 (SAP S/4HANA 2020) | < 8% |
| Master Data in SAP S/4HANA | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Lean Manufacturing in SAP S/4HANA | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. TS421, TS422 (SAP S/4HANA 2020) | 8% - 12% |
| Advanced Planning in SAP S/4HANA | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts TS421, TS422 (SAP S/4HANA 2020) | > 12% |
| Introduction to SAP S/4HANA Production Planning | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. TS421, TS422 (SAP S/4HANA 2020) | < 8% |
C_TS422_2020 Exam Certification Details:
| Cut Score: | 56% |
| Languages: | English |
| Level: | Associate |
NEW QUESTION 78
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?
- A. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
- B. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
- C. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
- D. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
Answer: C
NEW QUESTION 79
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
- A. Use batch determination.
- B. Use the batch information cockpit.
- C. Use the material staging report.
- D. Use the material where-used report.
Answer: B
NEW QUESTION 80
What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer.
- A. ABAP Managed Core Data Services (CDS)
- B. HANA Live
- C. Multid imensional Reporting client (MDRC)
- D. Smart Business Cockpit
Answer: A
NEW QUESTION 81
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?
- A. Plant Data
- B. MRP Controller
- C. MRP Profile
- D. MRP Group
Answer: D
NEW QUESTION 82
Where do you maintain the duration of a producton operation?
- A. Work instructions
- B. Material master
- C. Routing
- D. Bill of material (BOM)
Answer: C
NEW QUESTION 83
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Capacity Requirements Planning (CRP)
- B. Supply Chain Management (SCM)
- C. Material Requirements Planning (MRP)
- D. Integrated Business Planning (IBP)
Answer: B,D
NEW QUESTION 84
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Installation point
- B. Quantity
- C. Item type
- D. Scrap percentage
Answer: A,B
NEW QUESTION 85
How would you define pegging in the context of Advanced Planning?
- A. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
- B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
- C. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
- D. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
Answer: A
NEW QUESTION 86
In which data objects do you maintain the production line as the work center forrepetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Repetitive manufacturing profile
- B. Production cost collector
- C. Production version
- D. Routing
Answer: C,D
NEW QUESTION 87
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.
- A. Total replenishment lead time
- B. Operation duration
- C. Planned delivery time
- D. In-house production time
Answer: C,D
NEW QUESTION 88
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.
- A. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
- B. In the material master record, set MRP type to PI and a planning time fence on the replenishment lead time of the material
- C. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
- D. Manually firm all planned orders for materials within the replenishment lead time of the material
Answer: C,D
NEW QUESTION 89
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: Thereare 2 correct answers to this question.
- A. PRT Availability check must be set.
- B. Checking rule and group must be assigned.
- C. Checking control must have an overall profile assigned in customizing.
- D. Indicator Relevant for finite scheduling must be set.
Answer: C,D
NEW QUESTION 90
In which customizing activity do you set up automatic routing selection production orders?
Please choose the correct answer.
- A. Define order-type-dependent parameter
- B. Define production scheduling profile
- C. Define selection profiles
- D. Define scheduling parameters for production orders
Answer: A
NEW QUESTION 91
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.
- A. Product-related
- B. Order-related
- C. Milestone-related
- D. Cost-related
Answer: A,B
NEW QUESTION 92
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Make-to-stock production (10)
- B. Planning without final assembly (50)
- C. Make-to-order production (20)
- D. Planning with final assembly (40)
Answer: D
NEW QUESTION 93
When do you use variant bills of materials (BOMs)?
- A. When multiple master also have similar BOMs
- B. When multiple master also have the same BOM
- C. When a material has a configurable BOM
- D. When a material has multiple BOMs
Answer: B
NEW QUESTION 94
Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to this question.
- A. SAP S/4HANA Professional services cloud
- B. SAP S/4HANA private cloud
- C. SAP S/4AHANA Enterprise Management cloud
- D. SAP S/4HANA on premise
Answer: B,D
NEW QUESTION 95
......
C_TS422_2020 Study Guide Brilliant C_TS422_2020 Exam Dumps PDF: https://www.easy4engine.com/C_TS422_2020-test-engine.html