
C-TSCM42-67 Free Exam Study Guide! (Updated 108 Questions)
C-TSCM42-67 Dumps for SAP Certified Application Associate Certified Exam Questions & Answer
SAP PP Certification Exam Details:
| Level | Associate |
| Exam Price | $550 (USD) |
| Duration | 180 mins |
| Exam Name | SAP Certified Application Associate – Production Planning & Manufacturing with SAP ERP 6.0 EHP7 |
| Number of Questions | 80 |
| Reference Books | SCM240,SCM310, SCM300, SCM130, PLM114, TERP50, TERP01,SCM365 |
| Passing Score | C_TSCM42_67 - 63% |
| Exam Code | C_TSCM42_67 |
| Sample Questions | SAP PP Certification Sample Questions |
| Schedule Exam | SAP Training |
SAP C-TSCM42-67 Exam Description:
The certification "SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7" verifies the knowledge in the area of Production for the consultant profile. This certificate proves that the candidate has a basic understanding within this consultant profile and can implement this knowledge practically in projects. The SAP Certified Application Associate can contribute to the success of the planning and implementation phases of the project in a mentored role and would typically have a maximum of three years experience in the solution area. Project experience should not be prerequisite for a competent and well trained candidate to pass this exam.
NEW QUESTION 55
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
- A. It posts planning results to the database automatically.
- B. It triggers multilevel bottom-up scheduling.
- C. It propagates exception messages from a component to the finished product.
- D. It calculates the delay time which may occur in planning.
Answer: D
NEW QUESTION 56
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)
- A. Work center
- B. Material master
- C. Task list
- D. Production version
- E. Bill of material
Answer: B,C,E
NEW QUESTION 57
A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements?
- A. Plant data collection (PP-PDC) interface
- B. SAP Business Intelligence (BI)
- C. Execution Steps (XSteps) and process messages
- D. SAP Application Link Enabling (ALE)
Answer: C
NEW QUESTION 58
You want to enhance the system statuses of a production order with user statuses.
How do you do this?
- A. Define the user statuses in the Customizing table of the system statuses.
- B. Define a status profile in Customizing and assign it to the production scheduling profile.
- C. Define the user statuses in the order type-dependent parameters.
- D. Define a status profile in Customizing and assign it to the order type.
Answer: D
NEW QUESTION 59
Which of the following requirements is supported by using process orders?
- A. Linkage of documents to orders
- B. Documentation of the production using an electronic batch record
- C. Use of production/resource tools
- D. Use of reference operation sets
Answer: B
NEW QUESTION 60
You select the master data for production orders via production versions.
Which information is contained in a production version?
- A. The default order type to be used
- B. The routing and BOM alternatives to be used
- C. The explosion dates for the routing and BOM
- D. The control parameters for selecting routings and BOM
Answer: B
NEW QUESTION 61
Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt?
- A. Set "Container full"
- B. Set "Container empty"
- C. Set "Container in process"
- D. Set "Container in transport"
Answer: A
NEW QUESTION 62
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)
- A. LTP focuses on the operational planning of important components.
- B. LTP creates purchase requisitions for external procurement.
- C. A planning scenario must be released before it can be used in LTP.
- D. Reorder point planned materials can be included in LTP.
Answer: C,D
NEW QUESTION 63
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned orders? (Choose three)
- A. Automatic selection of the production version in material requirements planning (MRP) using the selection methods setting
- B. Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP)
- C. A planning algorithm from capacity planning
- D. Manual assignment of planned production quantities in a planning table
- E. Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP)
Answer: A,B,D
NEW QUESTION 64
Which of the following organizational efforts can be minimized using the KANBAN procedure?
- A. Effort for master data maintenance
- B. Effort for material staging
- C. Effort for capacity planning
- D. Effort for Sales and Operations Planning (SOP)
Answer: B
NEW QUESTION 65
What are characteristics of repetitive manufacturing? (Choose three)
- A. Production without using production orders and without status management
- B. Continuous material consumption, production flow and output
- C. Shop fabrication
- D. Automatic line loading based on capacity limits across all production lines
- E. Period-based planning of the quantities to be produced
Answer: A,B,E
NEW QUESTION 66
What sequence do you follow in master data maintenance to define the production of a material?
- A. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing
- B. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing
- C. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
- D. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
Answer: B
NEW QUESTION 67
Which activity can trigger an automatic availability check for the components of a production order?
- A. Material staging
- B. Goods receipt for a missing part
- C. Order release
- D. Order rescheduling
Answer: C
NEW QUESTION 68
Which of the following statements best defines SAP ERP?
- A. SAP ERP is an application that supports all processes involving direct customer contact throughout the entire customer relationship life cycle.
- B. SAP ERP is a system hardware that includes components such as Purchasing, Sales and Distribution, Materials Management, and Production.
- C. SAP ERP is a system in which advanced planning and optimization processes can be mapped.
- D. SAP ERP is an application that a company can use to manage its business processes efficiently.
Answer: D
NEW QUESTION 69
Where can you define the valid receivers for production order costs?
- A. In the valuation variant
- B. In the production scheduling profile
- C. In the settlement profile
- D. In the costing variant
Answer: C
NEW QUESTION 70
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.
However, a corresponding rescheduling exception message does not appear.
What could be the reasons? (Choose two)
- A. The MRP elements are linked via fixed pegging.
- B. Requirements planning has not been carried out.
- C. The delta between the availability dates falls within the tolerance window defined in Customizing.
- D. The fixed planned order is outside the rescheduling horizon.
Answer: C,D
NEW QUESTION 71
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)
- A. Reducing the order quantity
- B. Confirming the operation
- C. Setting the status technically complete (TECO)
- D. Rescheduling the operation
- E. Posting the goods receipt for the production order
Answer: A,B,C
NEW QUESTION 72
Which of the following items of master data are needed for repetitive manufacturing? (Choose three)
- A. Repetitive manufacturing profile
- B. Product cost collector
- C. Master record for serial numbers
- D. Production supply area
- E. Production version
Answer: A,B,E
NEW QUESTION 73
What functions can you use for sub operations? (Choose two)
- A. Costing
- B. Production/Resource tools allocation
- C. Capacity planning
- D. Material component allocation
Answer: A,C
NEW QUESTION 74
Which statements are true for ECC Long-Term Planning (LTP)? (Choose two.)
- A. In case of external procurement, long-term planning creates purchase requisitions.
- B. A planning scenario must be released to use it in long-term planning.
- C. Long-term planning generally is operational planning of important components.
- D. Reorder point planned materials can be included in long-term planning.
Answer: B,D
NEW QUESTION 75
Which of the following functions does SAP Supply Chain Management (SCM) offer?
- A. Product development, safety, quality, and maintenance
- B. Communication with customers through different interaction channels
- C. Planning of supply chains across company boundaries
- D. Optimization of the procurement strategy with the supplier pool
Answer: C
NEW QUESTION 76
Which of the following structural elements does a process order have? (Choose three.)
- A. Parallel sequences
- B. Characteristic-based process instructions
- C. Phases
- D. Item data
- E. Relationships
Answer: B,C,E
NEW QUESTION 77
What can you use to organize material staging for production orders? (Choose three)
- A. Material documents
- B. Transfer orders
- C. Logistics Information System (LIS)
- D. Pull list
- E. KANBAN
Answer: B,D,E
NEW QUESTION 78
......
SAP C-TSCM42-67 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Basics on SAP Business Processes (E-Learnings) < 8% | Outline the scope of SAP SCM business processes. |
| Application Overview and Background < 8% | Characterize the interplay of master data, planning, ATP, and production functionality. |
| Material and Capacity Requirements Planning > 12% | Characterize production-relevant planning functionality. |
| Production Orders Advanced (PP-SFC) > 12% | Configure production order functionality. |
| Master Data (LDM) 8% - 12% | Set up master data for production planning and manufacturing. |
| Production Orders Basics (PP-SFC) 8% - 12% | Apply production order functionality. |
| Process Orders (PP-PI) < 8% | Identify specific properties of process orders. |
| Lean Manufacturing (PP-REM, PP-KAB) 8% - 12% | Outline the highlights of repetitive manufacturing and kanban. |
| Material Requirements Planning (PP-MRP) > 12% | Explore material requirements planning functions. |
Use Real C-TSCM42-67 Dumps - 100% Free C-TSCM42-67 Exam Dumps: https://www.easy4engine.com/C-TSCM42-67-test-engine.html

